ENSA (Elektra Noreste)
Electricity distributor for the eastern side of Panama City, Colón and Darién (EPM Group). In our guide it serves Condado del Rey, Altos de Panamá, Costa del Este and most of El Dorado.
Requirements to sign up · checked on 27 Oct 2026
Owner
- Copy of the title deed or a Public Registry certificate (valid for 1 year) in the applicant's name
- Valid national ID (or passport / immigration card for foreigners)
- No outstanding electricity debts with the distributor
- New property: occupancy permit or certificate from the municipality
Tenant
- The same as the owner (title deed or Public Registry certificate of the property)
- Copy of the lease signed with the owner
- Copy of the owner's ID
Foreigner (passport, lease, residence card)
- Valid passport or immigration card (Servicio Nacional de Migración) instead of the cédula
- If you cannot attend in person: original authorization letter (valid 6 months) with a copy of both people's IDs
Deposit and connection cost
- Deposit / guarantee
- If you present a good payment history certificate or credit references from the last 5 years, no deposit is charged. Without them, ENSA may ask for a security deposit of up to one (1) month of estimated consumption (per the tariff's general conditions). With a prepaid meter there is no deposit and no connection charge.
- Connection / installation
- Connection charge of up to B/. 16.69 (BTS rate, 2026-2030 tariff schedule, Res. AN 22031-Elec).
Official rates
BTS rate in force from 1 September to 31 December 2026 (ASEP), with the general FET discount and the October 2026 fuel adjustment.
- Fixed charge (includes the first 10 kWh): B/. 2.76 a month
- 11 to 300 kWh: B/. 0.17737 per kWh
- 301 to 750 kWh: B/. 0.24666 per kWh (only the kWh in that block)
- Over 750 kWh: B/. 0.27005 per kWh
- FET discount (state subsidy): 26.61 % to 46.19 % up to 300 kWh; a smaller additional FET in some higher ranges
- Fuel adjustment (oct 2026): B/. 0.00009 per kWh (no FET applies)
Typical monthly cost: See the examples: a 2-bedroom apartment without A/C uses about 200 kWh; with air conditioning it exceeds 600 kWh a month.
| Case | kWh | Estimated bill | Breakdown |
|---|---|---|---|
| 1 bedroom, no A/C | 177 | B/. 19.35 | Fixed B/. 2.76 + energy B/. 29.62 · FET −40.29% (B/. -13.05) · fuel B/. 0.02 |
| 1 bedroom, with A/C | 423 | B/. 84.57 | Fixed B/. 2.76 + energy B/. 81.78 · FET −0% (B/. 0.00) · fuel B/. 0.04 |
| 2 bedrooms, no A/C | 223 | B/. 29.63 | Fixed B/. 2.76 + energy B/. 37.78 · FET −26.96% (B/. -10.93) · fuel B/. 0.02 |
| 2 bedrooms, with A/C | 715 | B/. 145.10 | Fixed B/. 2.76 + energy B/. 153.80 · FET −7.36% (B/. -11.52) · fuel B/. 0.06 |
| 3 bedrooms, no A/C | 260 | B/. 34.59 | Fixed B/. 2.76 + energy B/. 44.34 · FET −26.61% (B/. -12.53) · fuel B/. 0.02 |
| 3 bedrooms, with A/C | 998 | B/. 230.49 | Fixed B/. 2.76 + energy B/. 229.41 · FET −0.76% (B/. -1.76) · fuel B/. 0.09 |
Where and how to apply
Online at the Oficina Virtual ("new supply" form), in the Ensa Panamá app or by appointment at a customer center (Bethania, Los Andes, La Doña, Las Cumbres, Villa Lucre and others).
How to pay
Oficina Virtual and the Ensa Panamá app, online banking and payment centers. Prepaid: top-ups at Punto Pago and at ATMs of most banks. Need online banking? Banks for foreigners →
- Garbage fee
- In the San Miguelito district, ENSA bills the AAUD garbage fee on the electricity bill (contract from 19 Jan 2026 to 19 Jan 2031).
- Website
- ensa.com.pa
- Phone
- 323-7100 · 800-9111
Areas in our guide served by ENSA
In El Dorado the boundary with Naturgy runs along Av. Ricardo J. Alfaro: Dos Mares and the west side of the avenue belong to Naturgy. Check the property's previous bill.
Condado del Rey
ENSA (maintenance notices for "Amelia Denis de Icaza, Condado del Rey"). If the building faces Av. Ricardo J. Alfaro, check the previous bill.
Vía Centenario
Ancón appears in both ENSA's and Naturgy's (Edemet) district lists: check the distributor on the apartment's latest electricity bill.
Altos de Panamá
ENSA: the Ernesto Córdoba Campos and Amelia Denis de Icaza districts are in its concession.
Costa del Este
ENSA: the whole Juan Díaz district is in its concession (maintenance notices for Costa del Este).
El Dorado
Split: ENSA in most of it (El Dorado, Las Mercedes and surroundings); Naturgy in Dos Mares and on the west side of Av. Ricardo J. Alfaro, which is the boundary between them. Check the property's previous bill.
FAQ
What documents does ENSA ask a tenant for?
The same as the owner (title deed or Public Registry certificate of the property). Copy of the lease signed with the owner. Copy of the owner's ID.
Can a foreigner sign up with ENSA?
Valid passport or immigration card (Servicio Nacional de Migración) instead of the cédula. If you cannot attend in person: original authorization letter (valid 6 months) with a copy of both people's IDs.
How much does it cost to connect with ENSA?
Connection charge of up to B/. 16.69 (BTS rate, 2026-2030 tariff schedule, Res. AN 22031-Elec). If you present a good payment history certificate or credit references from the last 5 years, no deposit is charged. Without them, ENSA may ask for a security deposit of up to one (1) month of estimated consumption (per the tariff's general conditions). With a prepaid meter there is no deposit and no connection charge.
How do I pay ENSA?
Oficina Virtual and the Ensa Panamá app, online banking and payment centers. Prepaid: top-ups at Punto Pago and at ATMs of most banks.
Official sources (checked on 27 Oct 2026): ENSA – Nuevo suministro residencial (requisitos) · ENSA – ¿Cómo se calcula el depósito de garantía? · ENSA – Tarifas (pliego II semestre 2026, Res. AN 21990-Elec) · ASEP – Tarifas de electricidad para clientes regulados, vigentes del 1 sep al 31 dic 2026 (incluye FET) · ASEP – Variación por combustible, segundo semestre 2026 · ASEP – Pliegos tarifarios 2026-2030 (Res. AN 22031-Elec ENSA y AN 22032-Elec EDEMET) · ENSA – Clasificación de corregimientos de su concesión · ENSA – Mantenimientos programados (Costa del Este; Condado del Rey) · ENSA – Primera fase del Smart Grid en El Dorado, Tinajitas y Los Andes · ASEP – Contrato de concesión EDEMET, Anexo A (límite EDEMET–ENSA)
Where it says "ask", the provider does not publish that information on its website: we do not make it up. TuHogar en Panamá is not affiliated with any provider.