TuHogar en Panamá

💡 Utilities · Electricity

EDECHI (Naturgy Chiriquí)

Naturgy runs EDECHI, the electricity distributor for Chiriquí and Bocas del Toro. In our guide it serves Las Lomas (David district), which appears in its official concession-area table.

Requirements to sign up · checked on 27 Oct 2026

Owner

  • Copy of the title deed or a Public Registry certificate (valid for 1 year) in the applicant's name
  • Valid national ID (or passport / immigration card for foreigners)
  • No outstanding electricity debts with the distributor
  • New property: occupancy permit or certificate from the municipality

Tenant

  • The same as the owner (title deed or Public Registry certificate of the property)
  • Copy of the lease signed with the owner
  • Copy of the owner's ID

Foreigner (passport, lease, residence card)

  • Valid passport or immigration card (Servicio Nacional de Migración) instead of the cédula
  • If you cannot attend in person: original authorization letter (valid 6 months) with a copy of both people's IDs

Deposit and connection cost

Deposit / guarantee
Naturgy charges a "security deposit and connection fee per the current tariff"; the amount is not published: ask Naturgy.
Connection / installation
EDECHI connection charge: ask Naturgy (we did not verify it in its tariff schedule).

Official rates

BTS rate in force from 1 September to 31 December 2026 (ASEP), with the general FET discount and the October 2026 fuel adjustment.

  • Fixed charge (includes the first 10 kWh): B/. 3.04 a month
  • 11 to 300 kWh: B/. 0.19175 per kWh
  • 301 to 750 kWh: B/. 0.25341 per kWh (only the kWh in that block)
  • Over 750 kWh: B/. 0.27486 per kWh
  • FET discount (state subsidy): 53.53 % to 75.64 % (FET + FTO for September 2026; the FTO may vary monthly) up to 300 kWh; 20.09 % to 36.07 % above 300 kWh
  • Fuel adjustment (oct 2026): B/. -0.01175 per kWh (no FET applies)

Typical monthly cost: EDECHI's BTS rate has a higher energy charge than the capital's, but a larger FET discount up to 300 kWh: use the calculator with EDECHI selected.

CasekWhEstimated billBreakdown
1 bedroom, no A/C177B/. 14.17Fixed B/. 3.04 + energy B/. 32.02 · FET −53.66% (B/. -18.81) · fuel B/. -2.08
1 bedroom, with A/C423B/. 62.39Fixed B/. 3.04 + energy B/. 86.78 · FET −25% (B/. -22.45) · fuel B/. -4.97
2 bedrooms, no A/C223B/. 17.76Fixed B/. 3.04 + energy B/. 40.84 · FET −53.55% (B/. -23.50) · fuel B/. -2.62
2 bedrooms, with A/C715B/. 100.22Fixed B/. 3.04 + energy B/. 160.77 · FET −33.69% (B/. -55.19) · fuel B/. -8.40
3 bedrooms, no A/C260B/. 20.63Fixed B/. 3.04 + energy B/. 47.94 · FET −53.53% (B/. -27.29) · fuel B/. -3.05
3 bedrooms, with A/C998B/. 152.58Fixed B/. 3.04 + energy B/. 237.81 · FET −31.78% (B/. -76.54) · fuel B/. -11.73

Where and how to apply

Contracting and installation are handled by a Naturgy representative at a branch with your documents; the Oficina Virtual is for managing the account afterwards.

How to pay

Online payment at Naturgy's Oficina Virtual, online banking and authorized payment centers (list on its website). Need online banking? Banks for foreigners →

Areas in our guide served by EDECHI

It serves Chiriquí and Bocas del Toro provinces and the Ngäbe-Buglé comarca, per Naturgy. In the David district, the Las Lomas corregimiento is listed as a "Suburban Area".

Las Lomas (David, Chiriquí)

EDECHI (Naturgy): the Las Lomas corregimiento, David district, appears in its official concession-area table ("Suburban Area").

Estimate the monthly cost here · Buildings & communities

FAQ

What documents does EDECHI ask a tenant for?

The same as the owner (title deed or Public Registry certificate of the property). Copy of the lease signed with the owner. Copy of the owner's ID.

Can a foreigner sign up with EDECHI?

Valid passport or immigration card (Servicio Nacional de Migración) instead of the cédula. If you cannot attend in person: original authorization letter (valid 6 months) with a copy of both people's IDs.

How much does it cost to connect with EDECHI?

EDECHI connection charge: ask Naturgy (we did not verify it in its tariff schedule). Naturgy charges a "security deposit and connection fee per the current tariff"; the amount is not published: ask Naturgy.

How do I pay EDECHI?

Online payment at Naturgy's Oficina Virtual, online banking and authorized payment centers (list on its website).

Official sources (checked on 27 Oct 2026): Naturgy – Zonas de concesión (tabla EDECHI: Chiriquí, David, Las Lomas) · Naturgy – Contratación (requisitos) · Naturgy – Centros de pago y atención · ASEP – Tarifas de electricidad para clientes regulados, vigentes del 1 sep al 31 dic 2026 (incluye FET) · ASEP – Variación por combustible, segundo semestre 2026

Where it says "ask", the provider does not publish that information on its website: we do not make it up. TuHogar en Panamá is not affiliated with any provider.